IN PHOTOS: BMC begins repair work on Mumbai Mayor's bungalow in Byculla

The BMC has started the repair work of the Mayor's bungalow located in the Byculla zoo premises in Mumbai, on Monday (PICS/ASHISH RAJE)

Updated On: 2025-01-21 12:09 AM IST

Compiled by : Divya Nair

PIC/ASHISH RAJE

The bungalow has remained closed since March 2022 due to various maintenance issues

A significant problem in the bungalow has been the presence of termites in its wooden structures

As part of the restoration, the BMC is conducting extensive anti-termite treatment to address the infestation

The project also includes repairing leakages that have plagued the bungalow's structure

Refinishing work is being undertaken to restore the bungalow to its original condition

The entire repair project has been allocated a budget of Rs 65 lakh

The Byculla house was meant to be a temporary arrangement. The original Mayor's Bungalow, a 1928-built structure located at Shivaji Park in Dadar, was officially handed over to the Balasaheb Thackeray Memorial Public Trust in 2018 

To accommodate the mayor, the Brihanmumbai Municipal Corporation (BMC) decided to construct a new bungalow on a 4,300 square-metre plot adjacent to the original bungalow at Shivaji Park

Next Gallery

No one can demand long hours at work: Narayana Murthy in Mumbai

Related Photos